[ 1/29/24 - 2/2/24 ] Massive Progress Made
- Nate Hopper

- Feb 2, 2024
- 1 min read
It's finally done. I have finally soldered all eight of the boards, which means that the majority of the work is finished. I spent this week testing the eight boards after soldering them, using a power supply to test the needed voltage, which I determined to be 6 Volts with at least 2 Amps of current.
The order for the new power supply has been put in, and now I'm waiting for it to come in. I plan to work on code for the time until the power source arrives, working on commenting it, and getting a tracking code made to monitor positions of the pieces.
![[ 5/20/24 - 5/24/24 ] The End.](https://static.wixstatic.com/media/6146f1_29613f13fdfe4d90a81b823239088ea3~mv2.jpg/v1/fill/w_980,h_1307,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/6146f1_29613f13fdfe4d90a81b823239088ea3~mv2.jpg)
![[ 5/13/24 - 5/17/24 ] Second to Last](https://static.wixstatic.com/media/6146f1_862c0365d21e42aaa8a933a986021759~mv2.jpg/v1/fill/w_980,h_1307,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/6146f1_862c0365d21e42aaa8a933a986021759~mv2.jpg)
Comments